Planning M-building renovation + robotlab (Reglerteknik to M)

Resource Allocation 2023-01-01 - 2023-09-30
No.
Name
2023
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
9.0d
3.4w
5.0d
5.0d
3.5d
9.0d

Start: 2023-Jan-19 End: 2023-Feb-23


Resources:

Alexander Pisarevskiy (alexanderp)


Precursors:


Followers:

2.2w

Start: 2023-Jan-19 End: 2023-Feb-23


Resources:

Alexander Pisarevskiy (alexanderp)


Precursors:


Followers:

Start: 2023-Jan-19 End: 2023-Feb-23


Resources:


Precursors:


Followers:

Start: 2023-Feb-01 End: 2023-Feb-07


Resources:


Precursors:

Bed and UI design from Vattenhallen (farmbot.farmbot.design) ]->[ 2023-Feb-01


Followers:

Mount connector panel, computer and cabling (farmbot.farmbot.mount_electronics) ]->[ 2023-Mar-10

5.0d

Start: 2023-Feb-01 End: 2023-Feb-07


Resources:

Alexander Pisarevskiy (alexanderp)


Precursors:

Bed and UI design from Vattenhallen (farmbot.farmbot.design) ]->[ 2023-Feb-01


Followers:

Mount connector panel, computer and cabling (farmbot.farmbot.mount_electronics) ]->[ 2023-Mar-10

Start: 2023-Feb-01 End: 2023-Feb-07


Resources:


Precursors:

Bed and UI design from Vattenhallen (farmbot.farmbot.design) ]->[ 2023-Feb-01


Followers:

Mount connector panel, computer and cabling (farmbot.farmbot.mount_electronics) ]->[ 2023-Mar-10

Start: 2023-Feb-08 End: 2023-Feb-08


Resources:


Precursors:

Troubleshoot pixel coordinates (farmbot.farmbot.pixels) ]->[ 2023-Jan-31


Followers:

Move to vattenhallen (farmbot.farmbot.move) ]->[ 2023-Feb-27

1.0d

Start: 2023-Feb-08 End: 2023-Feb-08


Resources:

Alexander Pisarevskiy (alexanderp)


Precursors:

Troubleshoot pixel coordinates (farmbot.farmbot.pixels) ]->[ 2023-Jan-31


Followers:

Move to vattenhallen (farmbot.farmbot.move) ]->[ 2023-Feb-27

Start: 2023-Feb-08 End: 2023-Feb-08


Resources:


Precursors:

Troubleshoot pixel coordinates (farmbot.farmbot.pixels) ]->[ 2023-Jan-31


Followers:

Move to vattenhallen (farmbot.farmbot.move) ]->[ 2023-Feb-27

Start: 2023-Mar-10 End: 2023-Mar-16


Resources:


Precursors:

Move to vattenhallen (farmbot.farmbot.move) ]->[ 2023-Mar-10, Prepare connector panel, computer and cabling (farmbot.farmbot.prepare_electronics) ]->[ 2023-Feb-07


Followers:

Final handover (farmbot.farmbot.final_handover) ]->[ 2023-Mar-16

5.0d

Start: 2023-Mar-10 End: 2023-Mar-16


Resources:

Alexander Pisarevskiy (alexanderp)


Precursors:

Move to vattenhallen (farmbot.farmbot.move) ]->[ 2023-Mar-10, Prepare connector panel, computer and cabling (farmbot.farmbot.prepare_electronics) ]->[ 2023-Feb-07


Followers:

Final handover (farmbot.farmbot.final_handover) ]->[ 2023-Mar-16

Start: 2023-Mar-10 End: 2023-Mar-16


Resources:


Precursors:

Move to vattenhallen (farmbot.farmbot.move) ]->[ 2023-Mar-10, Prepare connector panel, computer and cabling (farmbot.farmbot.prepare_electronics) ]->[ 2023-Feb-07


Followers:

Final handover (farmbot.farmbot.final_handover) ]->[ 2023-Mar-16

Start: 2023-Apr-17 End: 2023-Apr-21


Resources:


Precursors:

M move heavy stuff (milestones.m_tunga_lyft) ]->[ 2023-Apr-15, Safety System assembly (KC) (robot_lab.safety_kc_assembly) ]->[ 2020-Jun-02


Followers:

5.0d

Start: 2023-Apr-17 End: 2023-Apr-21


Resources:

Anders Nilsson (andersn), Alexander Pisarevskiy (alexanderp)


Precursors:

M move heavy stuff (milestones.m_tunga_lyft) ]->[ 2023-Apr-15, Safety System assembly (KC) (robot_lab.safety_kc_assembly) ]->[ 2020-Jun-02


Followers:

Start: 2023-Apr-17 End: 2023-Apr-21


Resources:


Precursors:

M move heavy stuff (milestones.m_tunga_lyft) ]->[ 2023-Apr-15, Safety System assembly (KC) (robot_lab.safety_kc_assembly) ]->[ 2020-Jun-02


Followers:

Start: 2023-May-24 End: 2023-May-29


Resources:


Precursors:

M general access (milestones.m_general_access) ]->[ 2023-May-01, M final move (milestones.m_relocation) ]->[ 2023-May-24, Safety System assembly (KC) (robot_lab.safety_kc_assembly) ]->[ 2020-Jun-02


Followers:

3.5d

Start: 2023-May-24 End: 2023-May-29


Resources:

Anders Nilsson (andersn), Alexander Pisarevskiy (alexanderp), Anders Blomdell (andersb)


Precursors:

M general access (milestones.m_general_access) ]->[ 2023-May-01, M final move (milestones.m_relocation) ]->[ 2023-May-24, Safety System assembly (KC) (robot_lab.safety_kc_assembly) ]->[ 2020-Jun-02


Followers:

Start: 2023-May-24 End: 2023-May-29


Resources:


Precursors:

M general access (milestones.m_general_access) ]->[ 2023-May-01, M final move (milestones.m_relocation) ]->[ 2023-May-24, Safety System assembly (KC) (robot_lab.safety_kc_assembly) ]->[ 2020-Jun-02


Followers:

7.0d
3.2w
2.9w
3.0d
8.0d
4.0d
1.0d
2.0d

Start: 2023-Jan-20 End: 2023-Jul-03


Resources:

Anders Blomdell (andersb)


Precursors:


Followers:

3.0d

Start: 2023-Jan-20 End: 2023-Jul-03


Resources:

Anders Blomdell (andersb)


Precursors:


Followers:

2.0d

Start: 2023-Jan-20 End: 2023-Jul-03


Resources:

Anders Blomdell (andersb)


Precursors:


Followers:

3.0d

Start: 2023-Jan-20 End: 2023-Jul-03


Resources:

Anders Blomdell (andersb)


Precursors:


Followers:

5.0d

Start: 2023-Jan-20 End: 2023-Jul-03


Resources:

Anders Blomdell (andersb)


Precursors:


Followers:

4.0d

Start: 2023-Jan-20 End: 2023-Jul-03


Resources:

Anders Blomdell (andersb)


Precursors:


Followers:

1.0d

Start: 2023-Jan-20 End: 2023-Jul-03


Resources:

Anders Blomdell (andersb)


Precursors:


Followers:

Start: 2023-Jan-20 End: 2023-Jul-03


Resources:


Precursors:


Followers:

3.0d

Start: 2023-Jan-24 End: 2023-Mar-23


Resources:

Anders Blomdell (andersb)


Precursors:


Followers:

6.0d

Start: 2023-Jan-24 End: 2023-Mar-23


Resources:

Anders Blomdell (andersb)


Precursors:


Followers:

1.0d

Start: 2023-Jan-24 End: 2023-Mar-23


Resources:

Anders Blomdell (andersb)


Precursors:


Followers:

Start: 2023-Jan-24 End: 2023-Mar-23


Resources:


Precursors:


Followers:

2.0d

Start: 2023-Jan-30 End: 2023-Feb-08


Resources:

Anders Blomdell (andersb), Marcus Klang (marcusk)


Precursors:

M build start (milestones.m_build_start) ]->[ 2023-Jan-30


Followers:

Procurement (M) (robot_lab.safety_m.procurement) ]->[ 2023-Feb-08

5.5d

Start: 2023-Jan-30 End: 2023-Feb-08


Resources:

Anders Blomdell (andersb), Marcus Klang (marcusk)


Precursors:

M build start (milestones.m_build_start) ]->[ 2023-Jan-30


Followers:

Procurement (M) (robot_lab.safety_m.procurement) ]->[ 2023-Feb-08

Start: 2023-Jan-30 End: 2023-Feb-08


Resources:


Precursors:

M build start (milestones.m_build_start) ]->[ 2023-Jan-30


Followers:

Procurement (M) (robot_lab.safety_m.procurement) ]->[ 2023-Feb-08

Start: 2023-Feb-22 End: 2023-Mar-06


Resources:


Precursors:

M build start (milestones.m_build_start) ]->[ 2023-Jan-30, Procurement (M) (robot_lab.safety_m.procurement) ]->[ 2023-Feb-22


Followers:

Assembly (M) (robot_lab.safety_m.assembly) ]->[ 2023-Mar-06

1.5d

Start: 2023-Feb-22 End: 2023-Mar-06


Resources:

Anders Blomdell (andersb), Marcus Klang (marcusk)


Precursors:

M build start (milestones.m_build_start) ]->[ 2023-Jan-30, Procurement (M) (robot_lab.safety_m.procurement) ]->[ 2023-Feb-22


Followers:

Assembly (M) (robot_lab.safety_m.assembly) ]->[ 2023-Mar-06

0.5d

Start: 2023-Feb-22 End: 2023-Mar-06


Resources:

Anders Blomdell (andersb), Marcus Klang (marcusk)


Precursors:

M build start (milestones.m_build_start) ]->[ 2023-Jan-30, Procurement (M) (robot_lab.safety_m.procurement) ]->[ 2023-Feb-22


Followers:

Assembly (M) (robot_lab.safety_m.assembly) ]->[ 2023-Mar-06

Start: 2023-Feb-22 End: 2023-Mar-06


Resources:


Precursors:

M build start (milestones.m_build_start) ]->[ 2023-Jan-30, Procurement (M) (robot_lab.safety_m.procurement) ]->[ 2023-Feb-22


Followers:

Assembly (M) (robot_lab.safety_m.assembly) ]->[ 2023-Mar-06

Start: 2023-Mar-06 End: 2023-Mar-21


Resources:


Precursors:

M build start (milestones.m_build_start) ]->[ 2023-Jan-30, Test (M) (robot_lab.safety_m.test) ]->[ 2023-Mar-06


Followers:

0.5m

Start: 2023-Mar-06 End: 2023-Mar-21


Resources:

Anders Nilsson (andersn), Anders Blomdell (andersb)


Precursors:

M build start (milestones.m_build_start) ]->[ 2023-Jan-30, Test (M) (robot_lab.safety_m.test) ]->[ 2023-Mar-06


Followers:

Start: 2023-Mar-06 End: 2023-Mar-21


Resources:


Precursors:

M build start (milestones.m_build_start) ]->[ 2023-Jan-30, Test (M) (robot_lab.safety_m.test) ]->[ 2023-Mar-06


Followers:

Start: 2023-May-24 End: 2023-May-29


Resources:


Precursors:

M general access (milestones.m_general_access) ]->[ 2023-May-01, M final move (milestones.m_relocation) ]->[ 2023-May-24, Safety System assembly (KC) (robot_lab.safety_kc_assembly) ]->[ 2020-Jun-02


Followers:

3.0d

Start: 2023-May-24 End: 2023-May-29


Resources:

Anders Nilsson (andersn), Alexander Pisarevskiy (alexanderp), Anders Blomdell (andersb)


Precursors:

M general access (milestones.m_general_access) ]->[ 2023-May-01, M final move (milestones.m_relocation) ]->[ 2023-May-24, Safety System assembly (KC) (robot_lab.safety_kc_assembly) ]->[ 2020-Jun-02


Followers:

Start: 2023-May-24 End: 2023-May-29


Resources:


Precursors:

M general access (milestones.m_general_access) ]->[ 2023-May-01, M final move (milestones.m_relocation) ]->[ 2023-May-24, Safety System assembly (KC) (robot_lab.safety_kc_assembly) ]->[ 2020-Jun-02


Followers:

0.5m
5.0d
3.5d

Start: 2023-Mar-06 End: 2023-Mar-21


Resources:


Precursors:

M build start (milestones.m_build_start) ]->[ 2023-Jan-30, Test (M) (robot_lab.safety_m.test) ]->[ 2023-Mar-06


Followers:

0.5m

Start: 2023-Mar-06 End: 2023-Mar-21


Resources:

Anders Nilsson (andersn), Anders Blomdell (andersb)


Precursors:

M build start (milestones.m_build_start) ]->[ 2023-Jan-30, Test (M) (robot_lab.safety_m.test) ]->[ 2023-Mar-06


Followers:

Start: 2023-Mar-06 End: 2023-Mar-21


Resources:


Precursors:

M build start (milestones.m_build_start) ]->[ 2023-Jan-30, Test (M) (robot_lab.safety_m.test) ]->[ 2023-Mar-06


Followers:

Start: 2023-Apr-17 End: 2023-Apr-21


Resources:


Precursors:

M move heavy stuff (milestones.m_tunga_lyft) ]->[ 2023-Apr-15, Safety System assembly (KC) (robot_lab.safety_kc_assembly) ]->[ 2020-Jun-02


Followers:

5.0d

Start: 2023-Apr-17 End: 2023-Apr-21


Resources:

Anders Nilsson (andersn), Alexander Pisarevskiy (alexanderp)


Precursors:

M move heavy stuff (milestones.m_tunga_lyft) ]->[ 2023-Apr-15, Safety System assembly (KC) (robot_lab.safety_kc_assembly) ]->[ 2020-Jun-02


Followers:

Start: 2023-Apr-17 End: 2023-Apr-21


Resources:


Precursors:

M move heavy stuff (milestones.m_tunga_lyft) ]->[ 2023-Apr-15, Safety System assembly (KC) (robot_lab.safety_kc_assembly) ]->[ 2020-Jun-02


Followers:

Start: 2023-May-24 End: 2023-May-29


Resources:


Precursors:

M general access (milestones.m_general_access) ]->[ 2023-May-01, M final move (milestones.m_relocation) ]->[ 2023-May-24, Safety System assembly (KC) (robot_lab.safety_kc_assembly) ]->[ 2020-Jun-02


Followers:

3.5d

Start: 2023-May-24 End: 2023-May-29


Resources:

Anders Nilsson (andersn), Alexander Pisarevskiy (alexanderp), Anders Blomdell (andersb)


Precursors:

M general access (milestones.m_general_access) ]->[ 2023-May-01, M final move (milestones.m_relocation) ]->[ 2023-May-24, Safety System assembly (KC) (robot_lab.safety_kc_assembly) ]->[ 2020-Jun-02


Followers:

Start: 2023-May-24 End: 2023-May-29


Resources:


Precursors:

M general access (milestones.m_general_access) ]->[ 2023-May-01, M final move (milestones.m_relocation) ]->[ 2023-May-24, Safety System assembly (KC) (robot_lab.safety_kc_assembly) ]->[ 2020-Jun-02


Followers:

2.0d
4.0d
2.0d

Start: 2023-Jan-30 End: 2023-Jan-31


Resources:

Anton Tetov Johansson (anton)


Precursors:

start (farmbot.farmbot.epoch) ]->[ 2023-Jan-30


Followers:

Disassemble (farmbot.farmbot.disassembly) ]->[ 2023-Feb-08

Start: 2023-Jan-30 End: 2023-Jan-31


Resources:


Precursors:

start (farmbot.farmbot.epoch) ]->[ 2023-Jan-30


Followers:

Disassemble (farmbot.farmbot.disassembly) ]->[ 2023-Feb-08

Start: 2023-Feb-01 End: 2023-Feb-02


Resources:


Precursors:

start (farmbot.farmbot.epoch) ]->[ 2023-Jan-30


Followers:

Final handover (farmbot.farmbot.final_handover) ]->[ 2023-Mar-16

2.0d

Start: 2023-Feb-01 End: 2023-Feb-02


Resources:

Anton Tetov Johansson (anton)


Precursors:

start (farmbot.farmbot.epoch) ]->[ 2023-Jan-30


Followers:

Final handover (farmbot.farmbot.final_handover) ]->[ 2023-Mar-16

Start: 2023-Feb-01 End: 2023-Feb-02


Resources:


Precursors:

start (farmbot.farmbot.epoch) ]->[ 2023-Jan-30


Followers:

Final handover (farmbot.farmbot.final_handover) ]->[ 2023-Mar-16

Start: 2023-Feb-03 End: 2023-Feb-06


Resources:


Precursors:

Bed and UI design from Vattenhallen (farmbot.farmbot.design) ]->[ 2023-Feb-01


Followers:

Final handover (farmbot.farmbot.final_handover) ]->[ 2023-Mar-16

2.0d

Start: 2023-Feb-03 End: 2023-Feb-06


Resources:

Anton Tetov Johansson (anton)


Precursors:

Bed and UI design from Vattenhallen (farmbot.farmbot.design) ]->[ 2023-Feb-01


Followers:

Final handover (farmbot.farmbot.final_handover) ]->[ 2023-Mar-16

Start: 2023-Feb-03 End: 2023-Feb-06


Resources:


Precursors:

Bed and UI design from Vattenhallen (farmbot.farmbot.design) ]->[ 2023-Feb-01


Followers:

Final handover (farmbot.farmbot.final_handover) ]->[ 2023-Mar-16

2.0d
8.0d
2.0d

Start: 2023-Jan-30 End: 2023-Feb-10


Resources:

Björn Olofsson (bjorno)


Precursors:


Followers:

Procurement (robot_lab.fencing.procurement) ]->[ 2023-Feb-10, 3D printed parts (robot_lab.fencing.print_3d) ]->[ 2023-Feb-10, Build (robot_lab.fencing.build) ]->[ 2023-Mar-27

8.0d

Start: 2023-Jan-30 End: 2023-Feb-10


Resources:

Björn Olofsson (bjorno)


Precursors:


Followers:

Procurement (robot_lab.fencing.procurement) ]->[ 2023-Feb-10, 3D printed parts (robot_lab.fencing.print_3d) ]->[ 2023-Feb-10, Build (robot_lab.fencing.build) ]->[ 2023-Mar-27

Start: 2023-Jan-30 End: 2023-Feb-10


Resources:


Precursors:


Followers:

Procurement (robot_lab.fencing.procurement) ]->[ 2023-Feb-10, 3D printed parts (robot_lab.fencing.print_3d) ]->[ 2023-Feb-10, Build (robot_lab.fencing.build) ]->[ 2023-Mar-27

5.0d
5.0d
5.0d
2.0d

Start: 2023-Jan-23 End: 2023-Jan-24


Resources:

Johan Lauri (johanl)


Precursors:


Followers:

Move (robot_lab.robot_L3.move) ]->[ 2023-Jan-25

Start: 2023-Jan-23 End: 2023-Jan-24


Resources:


Precursors:


Followers:

Move (robot_lab.robot_L3.move) ]->[ 2023-Jan-25

1.0d

Start: 2023-Jan-25 End: 2023-Jan-25


Resources:

Johan Lauri (johanl)


Precursors:

Disassemble (robot_lab.robot_L3.disassembly) ]->[ 2023-Jan-24


Followers:

Reassembly+test (robot_lab.robot_L3.reassembly_test) ]->[ 2023-Jan-26

Start: 2023-Jan-25 End: 2023-Jan-25


Resources:


Precursors:

Disassemble (robot_lab.robot_L3.disassembly) ]->[ 2023-Jan-24


Followers:

Reassembly+test (robot_lab.robot_L3.reassembly_test) ]->[ 2023-Jan-26

2.0d

Start: 2023-Jan-26 End: 2023-Jan-27


Resources:

Johan Lauri (johanl)


Precursors:

Move (robot_lab.robot_L3.move) ]->[ 2023-Jan-25


Followers:

Install safety controller (robot_lab.robot_L3.safety_controller) ]->[ 2023-Jan-27

Start: 2023-Jan-26 End: 2023-Jan-27


Resources:


Precursors:

Move (robot_lab.robot_L3.move) ]->[ 2023-Jan-25


Followers:

Install safety controller (robot_lab.robot_L3.safety_controller) ]->[ 2023-Jan-27

Start: 2023-Mar-27 End: 2023-Apr-07


Resources:


Precursors:

L3 (robot_lab.robot_L3) ]->[ 2023-Feb-10, Procurement (robot_lab.fencing.procurement) ]->[ 2023-Mar-24, Design (robot_lab.fencing.design) ]->[ 2023-Feb-10


Followers:

5.0d

Start: 2023-Mar-27 End: 2023-Apr-07


Resources:

Johan Lauri (johanl)


Precursors:

L3 (robot_lab.robot_L3) ]->[ 2023-Feb-10, Procurement (robot_lab.fencing.procurement) ]->[ 2023-Mar-24, Design (robot_lab.fencing.design) ]->[ 2023-Feb-10


Followers:

5.0d

Start: 2023-Mar-27 End: 2023-Apr-07


Resources:

Johan Lauri (johanl)


Precursors:

L3 (robot_lab.robot_L3) ]->[ 2023-Feb-10, Procurement (robot_lab.fencing.procurement) ]->[ 2023-Mar-24, Design (robot_lab.fencing.design) ]->[ 2023-Feb-10


Followers:

Start: 2023-Mar-27 End: 2023-Apr-07


Resources:


Precursors:

L3 (robot_lab.robot_L3) ]->[ 2023-Feb-10, Procurement (robot_lab.fencing.procurement) ]->[ 2023-Mar-24, Design (robot_lab.fencing.design) ]->[ 2023-Feb-10


Followers:

2.0d
2.0w
3.5d
2.0d

Start: 2023-Jan-30 End: 2023-Feb-08


Resources:

Anders Blomdell (andersb), Marcus Klang (marcusk)


Precursors:

M build start (milestones.m_build_start) ]->[ 2023-Jan-30


Followers:

Procurement (M) (robot_lab.safety_m.procurement) ]->[ 2023-Feb-08

5.5d

Start: 2023-Jan-30 End: 2023-Feb-08


Resources:

Anders Blomdell (andersb), Marcus Klang (marcusk)


Precursors:

M build start (milestones.m_build_start) ]->[ 2023-Jan-30


Followers:

Procurement (M) (robot_lab.safety_m.procurement) ]->[ 2023-Feb-08

Start: 2023-Jan-30 End: 2023-Feb-08


Resources:


Precursors:

M build start (milestones.m_build_start) ]->[ 2023-Jan-30


Followers:

Procurement (M) (robot_lab.safety_m.procurement) ]->[ 2023-Feb-08

Start: 2023-Feb-22 End: 2023-Mar-06


Resources:


Precursors:

M build start (milestones.m_build_start) ]->[ 2023-Jan-30, Procurement (M) (robot_lab.safety_m.procurement) ]->[ 2023-Feb-22


Followers:

Assembly (M) (robot_lab.safety_m.assembly) ]->[ 2023-Mar-06

4.5d

Start: 2023-Feb-22 End: 2023-Mar-06


Resources:

Anders Blomdell (andersb), Marcus Klang (marcusk)


Precursors:

M build start (milestones.m_build_start) ]->[ 2023-Jan-30, Procurement (M) (robot_lab.safety_m.procurement) ]->[ 2023-Feb-22


Followers:

Assembly (M) (robot_lab.safety_m.assembly) ]->[ 2023-Mar-06

3.5d

Start: 2023-Feb-22 End: 2023-Mar-06


Resources:

Anders Blomdell (andersb), Marcus Klang (marcusk)


Precursors:

M build start (milestones.m_build_start) ]->[ 2023-Jan-30, Procurement (M) (robot_lab.safety_m.procurement) ]->[ 2023-Feb-22


Followers:

Assembly (M) (robot_lab.safety_m.assembly) ]->[ 2023-Mar-06

Start: 2023-Feb-22 End: 2023-Mar-06


Resources:


Precursors:

M build start (milestones.m_build_start) ]->[ 2023-Jan-30, Procurement (M) (robot_lab.safety_m.procurement) ]->[ 2023-Feb-22


Followers:

Assembly (M) (robot_lab.safety_m.assembly) ]->[ 2023-Mar-06

1
Icon Nobody
ID: _nobody
2
Icon Alexander Pisarevskiy
ID: alexanderp
Icon Organize stuff on shelves
ID: robot_lab.organize_shelves
Icon Prepare connector panel, computer and cabling
ID: farmbot.farmbot.prepare_electronics
Icon Disassemble
ID: farmbot.farmbot.disassembly
Icon Mount connector panel, computer and cabling
ID: farmbot.farmbot.mount_electronics
Icon Move heavy robots to M
ID: robot_lab.robot_move_heavy_m
Icon Move light robots to M
ID: robot_lab.robot_move_light_m
3
Icon Anders Blomdell
ID: andersb
Icon Twilight project
ID: various.twilight
Icon Linear spring process
ID: various.linear_process
Icon Design (M)
ID: robot_lab.safety_m.design
Icon Test (M)
ID: robot_lab.safety_m.test
Icon Assembly (M)
ID: robot_lab.safety_m.assembly
Icon Move light robots to M
ID: robot_lab.robot_move_light_m
4
Icon Anders Nilsson
ID: andersn
Icon Assembly (M)
ID: robot_lab.safety_m.assembly
Icon Move heavy robots to M
ID: robot_lab.robot_move_heavy_m
Icon Move light robots to M
ID: robot_lab.robot_move_light_m
5
Icon Anton Tetov Johansson
ID: anton
Icon Troubleshoot pixel coordinates
ID: farmbot.farmbot.pixels
Icon Prepare handover (usage+installation)
ID: farmbot.farmbot.prepare_handover
Icon Prepare UI
ID: farmbot.farmbot.prepare_ui
6
Icon Björn Olofsson
ID: bjorno
Icon Design
ID: robot_lab.fencing.design
7
Icon Johan Lauri
ID: johanl
Icon Disassemble
ID: robot_lab.robot_L3.disassembly
Icon Move
ID: robot_lab.robot_L3.move
Icon Reassembly+test
ID: robot_lab.robot_L3.reassembly_test
Icon Build
ID: robot_lab.fencing.build
8
Icon Manuel Korell
ID: manuel
9
Icon Marcus Klang
ID: marcusk
Icon Design (M)
ID: robot_lab.safety_m.design
Icon Test (M)
ID: robot_lab.safety_m.test
10
Icon Pontus Andersson
ID: pontusa
11
Icon 3D printer
ID: zz_3d_printer
12
Icon 3D printer w MMU
ID: zz_3d_printer_mmu
Resource is fully loaded
Resource is partially loaded
Resource is available
Off duty time
Container Task
Task